Main menu

GeoSonic have been completing an increasing number of projects installing CMT Multilevel wells. Recent projects have include an operational industrial facility in Wales, a residential location in Cambridgeshire and a quayside location in central London whereby GeoSonic have successfully constructed and installed both 3 and 7 channel multi-level monitoring systems in a number of boreholes up to 50m.

Our drilling methods permits complete flexibility with regard to aquifer protection and the ‘telescoping’ of casing when forming boreholes in which to install this equipment. Coupled with our environmental control measures, we have been offering our clients a quality package for installation of multi-level systems that is both efficient and above all, clean.

The UK’s sole supplier of specialist multi-level equipment www.rshydro.co.uk now recommends GeoSonic to their clients for installation of the equipment for our quality and reliability.